MKD EXPO
MKD EXPO
  • Home
  • Questions
  • SALES
  • Contact US
  • Inst.Service
  • Door Style
  • Photo Gallery
  • Appointments
  • Remodeling
  • Countertop
  • Social
  • MODERN WOOD INFO
  • product information
  • accesories
  • team
  • VIDEOS
  • MORE VIDEOS-2
  • Más
    • Home
    • Questions
    • SALES
    • Contact US
    • Inst.Service
    • Door Style
    • Photo Gallery
    • Appointments
    • Remodeling
    • Countertop
    • Social
    • MODERN WOOD INFO
    • product information
    • accesories
    • team
    • VIDEOS
    • MORE VIDEOS-2
Ponte en contacto

  • Home
  • Questions
  • SALES
  • Contact US
  • Inst.Service
  • Door Style
  • Photo Gallery
  • Appointments
  • Remodeling
  • Countertop
  • Social
  • MODERN WOOD INFO
  • product information
  • accesories
  • team
  • VIDEOS
  • MORE VIDEOS-2
Ponte en contacto

Common Questions

Labeled diagram of a wooden cabinet with detailed construction features.

Product Quality: Our products are designed to the highest standards in style and function. We start by selecting only high quality raw materials, hardware, adhesives and finishes. This bundle of superior components is the first step to securing your long term satisfaction. The second step is a state of the art manufacturing process which ensures consistent production across the board. We have worked diligently to cut out waste and eliminate bottle necks. New manufacturing technologies are quickly implemented as they become available to the industry. The result is streamlined and efficient production costs which support a very competitive sales price for our products. The final step is thorough inspections. Components are inspected for quality at the completion of each step of the manufacturing process. When the entire process is complete, each batch of product is compared with a control group to make sure it will match warehouse inventory perfectly.

 

  • What is the product made of?     Our Cabinetry is constructed from of solid wood and wood veneers on plywood (veneer refers to thin slices of wood, usually thinner than 3 mm (1/8 inch), that typically are glued onto core panels  to produce flat panels such as doors, tops and panels for cabinets). The Cabinet boxes are made in ½” or 3/4" Plywood. The fronts (doors and drawers) are Solid maple wood;  (we don't use any melamine or particle board in our regular wood cabinets).
  • How is the product packaged?  Cabinets are packaged unassembled in a flat box
  • Are the doors, drawers, cabinet packaged in the same pack? Yes. When you purchase a cabinet you will receive all of the needed items for its construction.
  • Are the insides of the cabinets finished? Some come finish/ others are natural color Inside with wood veneers on plywood.
  • What types of drawer glides are used? Drawer glides vary from, steel, with Under mount, full extension, soft closing features, to epoxy coated, metal side mount depending on cabinet style.
  • Does the glass frame cabinet come with glass?  Yes, our glass frame cabinets come with glass. Glass styles vary.
  • Are cabinet knobs included in the package?  Cabinet Knobs are NOT included in the package.


  •  Fillers... Why Would I Need fillers? A filler is a piece of finished wood used to "fill" openings or gaps between cabinets, or a cabinet and any obstruction, that would inhibit the doors or drawers from fully functioning. If corners, tight spaces, and uneven walls are a challenge in your kitchen design, fillers may be necessary to complete your installation. Typically, fillers are used to finish the space where an overall dimension of cabinetry is less than the overall wall dimension. Most often, fillers are used vertically at the side of a cabinet, but they can also be used horizontally as crown molding risers or trim. Fillers are sold in 3" and 6" widths, and various lengths. We offers fillers to match each one of our cabinet door styles.

What else must be purchased to complete my kitchen?  Toe kick is needed for all base cabinets, Skins, panels & fillers may be needed, depends on your layout

 

 MY KITCHEN DESIGN EXPO

6852 Hanging Moss 

Rd Orlando, FL 32807

407-535-7237 (24/7)


contact us

Copyright © 2018 MY KITCHEN DESIGN EXPO - All Rights Reserved.

Con tecnología de